PORTFOLIO:

SHARED VISIONS FULFILLED

Dam/Spillway Restoration

Dam/Spillway Restoration

Private Individual

Restoration of an ODNR Class III dam with storage capacity of 56ac at a private lake. Project featured design of principal spillway and inlet, emergency spillway control section, completion of construction and final grading.

Reflection

Rails to Trails Project

Rails to Trails Project

City of St. Clairsville

Diversified Engineering provided conceptual layout and planning services for this project, including tunnel restoration, slope restoration and handled grant applications as well.

Reflection

Walking Trail Development

Walking Trail Development

Bob Huggins Basketball Camp

Diversified Engineering provided design and layout services for a trail and bridge within a flood plain. The bridge was engineered to withstand ponding and flowing water during flood season. In addition, basketball courts were designed and laid out.

Reflection

Wetland Restoration Area

Wetland Restoration Area

American Landfill

This wetland restoration project covered a 10.36-acre wetland. Diversified Engineering handled design plans, permitting NOI and mitigation. Other aspects of the project included storm water control, site topography and an inline water control structure.

Reflection

Redevelopment of Rail Beds to Trail

Redevelopment of Rail Beds to Trail

Guernsey County CDC

Diversified Engineering provided conceptual layout for this Rails to Trails project. The project included development of 5 miles of trails, parking lot with trail head parking, and design and layout for remote airplane parking, horse riding arena, and restroom facilities.

Reflection

Wetland Design

Wetland Design

Harrison Landfill

Design of a 28-acre wetland, including design pans, storm water control, site topography, inline water control structure, mitigation and permitting NOI.

Reflection

Waterline Extension

Waterline Extension

Village of Malvern

Over 6,000 linear feet of waterline was place, with 22 valves and 6 hydrants installed. Project culminated with pavement and lawn restoration.

Reflection

Waste Water Treatment Plant

Waste Water Treatment Plant

Village of West Lafayette

Modification of waste water treatment plant including waste water piping, 14 valves and pavement of access road. Construction was monitored weekly.

Reflection

Booster Station Project

Booster Station Project

Village of Sugarcreek

This project included waterline placement, waterline reconnection, storm sewer replacement and installation of two catch basins. To complete the project pavement and cement sidewalks also had to be replaced. Construction monitoring was conducted weekly.

Reflection

Drainage Improvement Project

Drainage Improvement Project

City of New Philadelphia

This project featured 770 linear feet of roadway surface drainage improvements, incorporating hot taps and shut-off valves into existing waterline, one fire hydrant, sidewalk, wheelchair inserts in sidewalk, centerline re-profiling and 431 linear feet of 8" iron waterline. Staff also handled daily construction monitoring.

Reflection

Sanitary Storm Sewer

Sanitary Storm Sewer

City of New Philadelphia

Project consisted of 2,131 linear feet of 60" storm sewer and 807 linear feet of 8" sanitary sewer, with 4,000 square yards of full width pavement overlay. Daily construction monitoring was performed.

Reflection

Well Pad: 18 days to completion

Well Pad: 18 days to completion

Noble County, Ohio

Well pad construction on a 30-acre site, with 60,000-yard earthwork. 25 test pits and 9 boreholes. Project constructed in 18 days.

Reflection

Wetland Mitigation

Wetland Mitigation

Anderson Propane

Initiated soil and plant sampling, tested for hydric soils, filed out ORAM report and EPA-PTI paperwork and created a mitigation design. This project included plant and macroinvertebrate identification, soil classification and determination of scoring boundaries.

Reflection

Well Pad: 15-acre site

Well Pad: 15-acre site

Guernsey County, Ohio

Well pad construction on 15-acre site, with 29 test pits and 7 boreholes. Project was completed in under one month.

Reflection

Water & Soil Sampling for EPA Permits

Water & Soil Sampling for EPA Permits

Dino Piergallini & Sons Equipment

Waste water pond water and soil sampling to obtain site-specific permits for the EPA. Project was completed in 6 days.

Reflection

Onsite Treatment Facility

Onsite Treatment Facility

Miller Septic Design

Design and engineering of a new onsite treatment facility on a 1.5-acre site. Featured 360 feet of leach field, and a dosing tank and septic tank were installed Included property survey, soil sampling, 2 probe readings and 4 test pits.

Reflection

Stony Hollow Landfill

Stony Hollow Landfill

Waste Management

Installation of 61 drilled wells, with 20,946 feet of piping connecting wells together. 70.5-acre site covered. Project constructed in two months.

Reflection

Fresh Water Impoundment

Fresh Water Impoundment

Antero Resources

Nine-month project featuring a 20-million-gallon capacity fresh water impoundment with geocomposite under the drain system and a geosynthetic membrane liner.

Reflection

Well Pad: 26-acre site

Well Pad: 26-acre site

Noble County, Ohio

Well pad construction on 26-acre site with 65,000 yards' earthwork, with 4 boreholes and 19 test pits. Project constructed in two months.

Reflection

Well Pad: 15-acre site

Well Pad: 15-acre site

Noble County, Ohio

Well pad construction on 15-acre site with 32,000 yards' surface soil, with 4 boreholes and 5 test pits. Project constructed in two months.

Reflection

Well Pad: 14-acre site

Well Pad: 14-acre site

Guernsey County, Ohio

Well pad construction on 14-acre site with 140,000 yards' earthwork, including 16 test pits and 4 boreholes. Project constructed in two months.

Reflection

New Headquarters Facility

New Headquarters Facility

Diversified Engineering

Two story masonry building with full basement, laboratory, training and storage facility. 54'x100' footprint and 16,356 sq. ft. DEI personnel served as engineer and general contractor for project.

Reflection

Residential Development

Residential Development

This project incorporated engineering of storm sewer, sanitary sewer, pump station, water line, site grading plan, street design and construction staking.

Reflection

New Animal Shelter Facility

New Animal Shelter Facility

Tuscarawas County Humane Society

Pre-engineered metal building measuring 134' x 46' and 6,313 sq. ft. The building features four rooms dedicated to cats with an outdoor play area, as well as a cat isolation room, and 33 dog kennels with an outside access room. The facility also features office and reception space, an adoption room, a procedure room, dog wash area, and laundry.

Reflection

FEMA Flood Elevation Certificate

FEMA Flood Elevation Certificate

CNL Income Lakefront Marina

ALTA-ACSM survey and FEMA flood elevation certificates for a 480-slip marina located on 32 acres of Lake Erie Shoreline. The project was performed using a combination of GPS and conventional survey technologies.

Reflection

ALTA-ACSM Survey

ALTA-ACSM Survey

UAW Ford Family Learning Center & Regency Hospital Corp., LLC

ALTA-ACSM survey of UAW Ford Learning Center, a daycare, situated on 8,676 acres of land.

Reflection

Wastewater Treatment System

Wastewater Treatment System

Wood’s Tall Timber Lake Resort Community Center

Surveying, mapping, design and engineering of a 17,000-gpd wastewater treatment system to handle increased flows from the construction of a proposed community center at the resort, as well as to replace the existing septic system. Valued at approximately $200,000, the system design included a new aeration treatment system, surface sand filters and ultraviolet disinfection equipment.

Reflection

Medical Complex

Medical Complex

Lewis Center Regional Medical Center

Surveying, mapping, site plan and building design, construction plans, specifications and construction management services for a 6.5 million dollar medical complex encompassing 35,000 sq. ft. of floor space on a 4-acre site.

Reflection

New Parking Lot

New Parking Lot

Buckeye Career Center

Project featured a 103 Parking stall area with two 12' bus lanes. It aslo included sidewalk replacement, new catch basins and ADA Ramps.

Reflection

New Educational Building

New Educational Building

Buckeye Career Center

$2.5 15,000 sq. ft. equipment resource training facility located in New Philadelphia. The project consisted of a masonry and light gauge metal roof truss, 60 foot structure with vocational classroom spaces and restrooms, as well as two pre-engineered metal building structures to be used for vocational lab spaces.

Reflection

Road Rehab & Resurfacing

Road Rehab & Resurfacing

Village of Dennison, Ohio

Surveying, engineering, construction layout and inspection for a $300,000 road rehabilitation and resurfacing project.

Reflection

Water Ponding Solution

Water Ponding Solution

City of New Philadelphia, Ohio

Design, engineering, construction layout and inspection for a storm sewer system developed to eliminate a long-standing problem with ponding water along the two streets.

Reflection

Water Ponding Solution

Water Ponding Solution

City of New Philadelphia, Ohio

Design, engineering, construction layout and inspection for a storm sewer system developed to eliminate a long-standing problem with ponding water near the intersection of two streets on the south side of the city.

Reflection

Storm Sewer System

Storm Sewer System

City of New Philadelphia, Ohio

Design, engineering, construction layout and inspection for a storm sewer system developed to eliminate a long-standing problem with ponding water near the intersection of two streets on the south side of the city.

Reflection

New Fire Station Building

New Fire Station Building

City of New Philadelphia

New fire station built on a 1-acre site. Project featured 6 bore holes, dynamic cone penetration testing and nuclear gauge testing during project construction. The entire project was designed and built in four months.

Reflection

Condo Development Plans & Documentation

Condo Development Plans & Documentation

Sugartree Condominiums

Design, preparation of construction plans, and preparation of final condominium filing documents for a 4-unit condominium project situated on a 1.7-acre site.

Reflection

14-Unit Condo Development

14-Unit Condo Development

Lockport Station Condominiums

Design, preparation of construction plans, and preparation of final condominium filing documents for a 14-unit condominium development situated on a 3-acre site.

Reflection

31-Unit Condo Development

31-Unit Condo Development

Eastport Landings

Design, preparation of construction plans, and preparation of final condominium filing documents for a 31-unit development situated on a 6.5-acre site.

Reflection

Residential Development Site Planning

Residential Development Site Planning

Stoneridge Land Co.

Surveying, mapping and preparation of site development for a 40-unit upscale residential development on 200 acres of land.

Reflection

Residential Development Infrastructure

Residential Development Infrastructure

Georgeview Estates Subdivision

Surveying, planning, engineering and construction document preparation for the sewers, water and paving required to service the 100-lot development.

Reflection

Digital, GPS & Conventional Surveying

Digital, GPS & Conventional Surveying

Dayton Healthcare Investors, Dayton Senior Care

ALTA-ACSM land title survey of Friendship Village. DEI utilized a combination of digital orthophotography, GPS and conventional surveying technologies to map the 29-acre retirement village, consisting of a 3.6-acre, multi-story assisted care center and 38 duplex living units.

Reflection

ALTA-ACSM Survey

ALTA-ACSM Survey

Bankfirst, Dayton Healthcare Investors, Dayton Senior Care, Covington

ALTA-ACSM survey of Friendship Village, an office/residential complex and planned unit development project.

Reflection

Shopping Plaza Expansion

Shopping Plaza Expansion

NAPA Auto Parts

As part of a 3.5-acre expansion to a commercial shopping plaza, Diversified Engineering provided the surveying, mapping and design services for the construction of a 9,500 sq. ft. NAPA Auto Parts Store valued at approximately $500,000. Professional services included building design and site planning, lighting and electrical design, construction plans and specifications, as well as construction management services.

Reflection

Shopping Plaza Expansion

Shopping Plaza Expansion

Wallhouse Coffee

As part of a 3.5 acre expansion to a commercial shopping plaza, Diversified Engineering provided the surveying, mapping and design services for the construction of a 2,558 sq. ft. coffeehouse. Professional services included building design, site planning, lighting and electrical design, construction plans and specifications, as well as construction management services.

Reflection

11,000 sq. ft. Shopping Center

11,000 sq. ft. Shopping Center

Sugarcreek Shopping Center

As part of a 2.5 acre commercial shopping plaza, Diversified Engineering provided the surveying, mapping and design services for the construction of an 11,000 sq. ft. shopping center. Professional services included building design, site planning, lighting and electrical design, construction plans and specifications.

Reflection

ALTA-ACSM Survey

ALTA-ACSM Survey

Foltz-Martin LLC

ALTA-ACSM survey of a former Target store located on a 15-acre parcel, situated in a suburb of Toledo, Ohio.Subsequent to the completion of the survey, DEI has worked with the owner to subdivide the site to create three additional sites for a bank and two restaurants.

Reflection

ALTA-ACSM Survey

ALTA-ACSM Survey

Wal-Mart Stores, Inc.

ALTA-ACSM survey of a former Wal-Mart located on a 9.2366-acre parcel, situated in Warren County.

Reflection

Residential Development Infrastructure

Residential Development Infrastructure

Oak Shadows Subdivision

Surveying, planning, engineering and construction document preparation for the sewers, water and paving improvements required to service the 81 lots in a 67.7-acre single-family development.

Reflection

Site Borderd Protected Wetlands

Site Borderd Protected Wetlands

KMC Properties Company, LLC

Preparation of boundary and topographic maps, ALTA-ACSM title surveys, grading and site utility plans, storm water retention management plan and construction layout staking for a 127,000 sq. ft. manufacturing facility situated on a very flat 50-acre site that borders protected wetlands.

Reflection

ALTA-ACSM Survey

ALTA-ACSM Survey

Republic Services of Ohio

ALTA-ACSM survey of a former industrial plant currently being used as a solid waste transfer station. The survey involved the retracement of a portion of three unimproved subdivisions located in the industrial area of Canton. Significant portions of the area had been razed, obliterating houses as well as original survey monumentation.

Reflection

Conventional Ground Surveying

Conventional Ground Surveying

Prologis

ALTA-ACSM land title survey of the 50-plus-acre Prologis Park Industrial Center in Cincinnati, Ohio. Due to the proximity of buildings and mature trees which precluded the use of GPS methods, the project was completed using conventional ground surveying technology.

Reflection

Site Development Plans

Site Development Plans

Caito Foods Service, Inc.

Surveying, mapping and preparation of site development plans for a 10 million dollar 101,000 sq. ft. cold-storage produce facility.

Reflection

Electrical System Design

Electrical System Design

North Star Metals

Electrical system design for a 27,000 square foot industrial building on a 9.8-acre site, as well as mapping and design services for the proposed onsite wastewater treatment and disposal facility.

Reflection

Sanitary Force Main

Sanitary Force Main

Skyline Corporation

Design, engineering, EPA submittals and approvals for three lift stations and a new sanitary force main to eliminate a small package wastewater treatment system and transport the sewage to the municipality’s sanitary sewer system.

Reflection
1

Who We Work For

Our team has completed many projects in many markets, from municipal projects to healthcare facilities and residential developments. Take a look at the many markets we've worked in. if you don't see yours, give us a call.

Our Clients Trust Us

Quotation Marks

Chris Bower and his staff are responsive, have great attention to detail and their services are very competitive.

Michael D. Kitchen

Alban Title Insurance

Read Full Testimonial

Our Clients Trust Us

Quotation Marks

We have found their staff to be knowledgeable, friendly and willing to go the extra mile to make the project work in a more efficient manner.

Honorable Teri Edwards

Village of Dennison

Read Full Testimonial

Our Clients Trust Us

Quotation Marks

DEI provides support and expertise one would expect from a large firm, yet lends the personal attention of a small firm.

Jim Teter

Republic Services

Read Full Testimonial

Our Clients Trust Us

Quotation Marks

I recommend DEI's services to every client that has a need for surveying.

Kathy Pietro

KIKO Real Estate & Auctioneers

Read Full Testimonial

Our Clients Trust Us

Quotation Marks

DEI's attention to detail was greatly appreciated in the design of the many features necessary to minimize impacts from the [landfill] remediation area.

Paul Ruesch

U.S. Environmental Protection Agency

Read Full Testimonial

Our Clients Trust Us

Quotation Marks

DEI's expertise and guidance has helped our company sell many properties.

Jeffrey P. Mathias

Pissocra-Mathias Realty

Read Full Testimonial

Our Clients Trust Us

Quotation Marks

We were quite pleased with the professionalism of both Chris Bower and members of the firm, and highly recommend their company.

Jim Cahill

Kimble Manufacturing Company

Read Full Testimonial